CAMBERLEY

Situated within a high security campus, Sentrum Camberley provides 75,000 sq ft of net technical space together with 80,000 sq ft of dedicated office space or disaster recovery suites. (Due to the nature of the scheme, the ancillary space is particularly well suited to disaster recovery facilities.)

Each bespoke customer solution is housed within a private data suite, with dedicated plant sited externally to maximise the available technical space.

Status

Fully Let

Sentrum Camberley at a Glance

  • 75,000 sq ft data centre / technical space
  • 80,000 sq ft dedicated office / disaster recovery space
  • High density solutions from 500 to 2500 watts/sq m
  • Mains powers supplied via 2 x 11kV incomers

Building

  • High density solutions from 500 to 2500 watts per sq metre
  • 24 x 7 x 365 building operation
  • Secure managed delivery bay with goods lift
  • Floor loading 10kN per square metre

Power

  • Mains power supplied via 2 x 11kV incomers
  • N+N or N+1 Uninterruptible Power Supply (UPS)
  • Back up generators with a minimum of 48 hours at full capacity
  • Re-fuelling contracts to ensure timely replacement
  • On-site substations
  • Room LV switchboards to manage power distribution
  • Power surge management
  • Power consumption metering

Cooling

  • Primary cooling infrastructure, centrally managed and linked to BMS
  • Room air conditioning units
  • Regulated humidity within a constant range

Building Management System

  • Power monitoring and building monitored systems to provide alarms
  • Power surge management
  • Dedicated in-house 24 x 7 facilities management team
  • Planned preventative maintenance programmes
  • Chilled water HVAC system
  • Minimum N+1 standby on all cooling systems

Fire Detection & Suppression

  • Three-stage fire detection systems in all plant areas
  • VESDA (Very Early Smoke Detection Apparatus)
  • Fire detection in all rooms, below raised floors and in ceiling voids
  • Double interlocked pre-action gas suppression to technical areas
  • Fire detection and suppression systems interconnected to central BMS
  • Fire alarms and wet pipe sprinkler systems in ancillary areas
  • Gas suppression systems using Argonite or Inergen
  • Gas extraction, ventilation and pressure relief systems

Connectivity

  • Access to multiple telecommunication providers
  • Diverse cable routing into facility
  • Diverse cable routing through raised floor to each suite
  • Strict cable management policy
  • Minimum of two fibre entry ducts to building and Meet Me Rooms (MMR)
  • Splicing chambers and draw pits
  • Multiple connection points to each suite
  • Horizontal and vertical basket trays to all risers
  • Space for satellite and antennae equipment

Ancillary Space

  • Dedicated office space
  • Disaster recovery suite